BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20190919T200000Z
DTEND:20190919T210000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Solar Ribbon Cutting-Dover High School
DESCRIPTION:Celebrate the installation of the largest rooftop solar array in our company's history! The project at the Dover High School and Career Technical Center includes 2\,581 solar panels\, increasing the state's solar capacity by 1.5% and saving Dover taxpayers more than $4 million long-term at no upfront cost.\n\n\n\nThe array will generate over 1\,000 megawatt-hours of electricity each year\, offsetting roughly 40% of the school's electric load. The solar power generated by the array is equivalent to offsetting 558 tons of carbon pollution each year or the annual electricity use of 88 homes or the carbon sequestered by 600 acres of forests.
X-ALT-DESC;FMTTYPE=text/html:Celebrate the installation of the largest rooftop solar array in our company&rsquo\;s history! The project at the Dover High School and Career Technical Center includes 2\,581 solar panels\, increasing the state&rsquo\;s solar capacity by 1.5% and saving Dover taxpayers more than $4 million long-term at no upfront cost.
\n
\nThe array will generate over 1\,000 megawatt-hours of electricity each year\, offsetting roughly 40% of the school&rsquo\;s electric load. The solar power generated by the array is equivalent to offsetting 558 tons of carbon pollution each year or the annual electricity use of 88 homes or the carbon sequestered by 600 acres of forests.
LOCATION:Dover High School & Career Technical Center 25 Alumni Drive\, Dover
UID:e.1570.28699
SEQUENCE:3
DTSTAMP:20240329T120741Z
URL:https://www.dovernh.org/events/details/solar-ribbon-cutting-dover-high-school-28699
END:VEVENT
END:VCALENDAR