I. Preface
"Opportunity is not a roaming wanderer that blesses households at random. It
seeks only those individuals that are well prepared to meet it."
Reed Thomas
Waterfront Represents Opportunity for Growth
This report represent the efforts of many volunteers and civic leaders who
have worked together for several years to prepare the City of Dover for the opportunities
that exist on the City-owned land along the Cochecho River in downtown Dover. The river,
and this waterfront area, serve as a common thread between the original settlement of
Dover in 1623, the growth of the Port of Dover in the 1800s, and the creation of
a vibrant manufacturing economy from the 1800s into the early 1900s. The
community is now turning again to the river and the downtown waterfront area as an
opportunity for economic growth and public access.
Partnership Guides Planning Effort
In December 1994 the Dover City Council created the Cochecho Riverfront
Partnership for the purpose of overseeing and coordinating
efforts associated with the redevelopment of the City-owned land. This group was made up
of representatives from the City Council, The Dover Economic Development Corporation, the
Greater Dover Chamber of Commerce, City staff, and individual citizens. Initially this
group decided that the most appropriate way to redevelop this 35-acre waterfront parcel
would be to work in partnership with a private developer to be selected through a Request
for Proposal process. However, the Partnership was concerned that the developer be subject
to development guidelines consistent with the communitys vision for this land. In
order to make this vision a reality, the partnership agreed that a team of local and
outside design experts should work together in an intensive design effort. This design
effort, known as a Charrette, would help provide the basis for the design guidelines for a
prospective developer.
Once the guidelines were established, the city would then seek a
qualified developer.
Design Charrette Results in Two Conceptual Plans and Development Guidelines
The Charrette team prepared two (2) conceptual plans that represent
alternative approaches to redevelopment of the waterfront rather than blueprints for
construction. Although the approaches differ in the intensity of development, each offers
an orderly and cost effective approach to the redevelopment effort that is compatible with
the existing downtown. The Partnership recognizes that the actual timing and intensity of
redevelopment will in large part be market driven. However, the proposed Design Guidelines
(Section V) and Program for Implementation (Section VI) of this report should be followed
to the greatest extent possible to ensure that the communitys vision and
expectations for the waterfront are met. The Design Guidelines are intended to ensure that
the future development guidelines address: (1) the scale of development and allowable
uses, (2) environmental quality, (3) circulation and access for pedestrians and vehicles,
and (4) management of development.
The Program for Implementation is intended to provide a schedule of activities and
investments by the City. These actions are intended to be manageable, but important steps
to maintain the progress made to date by the community and to prepare for development
opportunities.
Back to Table of Contents
II. Study Area
During the past two decades, the City of Dover has embarked on an
aggressive campaign to redevelop and revitalize its central business district. The City
has been successful in its endeavors and generally has a much lower vacancy rate among
retail, residential and office space in the urban core than many similar mill communities.
In fact, the 400,000 square foot Pacific Mills complex, once vacant for many years, is now
more than 95 percent occupied.
During this same period, one of Dovers most valuable assets, the
Cochecho River, has been neglected. Once a thriving port with deep water access, the
riverfront has been left to decline with limited boat traffic and virtually no public
access to this beautiful river.
Existing Site
The study area for the Design Charrette and subsequent Program for
Implementation, show on Figure 1, p. 4, is bounded generally as follows:
On the North by Portland Avenue and Cochecho Street
On the West by Pacific Mills
On the South by Henry Law Avenue
On the East by City owned land, including the Public Works complex and
Maglaras Park
What makes the Riverfront area particularly attractive for redevelopment
is that it consists of large tracts of publicly owned land. In addition, privately held
land in the area generally consists of underutilized land and buildings.
Within the waterfront area there are a total of 176 acres of land. Of this
number, 57 acres are vacant, 50 acres are considered underutilized, 45 acres are used for
recreation, 13 acres are residential and 11 acres are commercial.
The largest parcel is owned by the City on River Street. Consisting of 35
acres, the site currently houses the Citys public works operation and the recently
closed wastewater treatment plant. Both facilities are earmarked for removal, making the
entire parcel a prime area for development.
Two marketing studies completed in 1991 by Applied Economic Research of
Laconia, NH and R.K.G. Associates, Inc. from Durham, NH, have indicated that the site is
well suited for a mixed use development such as a 100-slip marina, a 200-seat restaurant
and conference facility, 50,000 square feet of office space and residential units.
Given the large number of acres in the riverfront area that are either
vacant or underutilized and the limited number of landowners controlling the parcels,
large-scale new development may become a reality. Conservative estimates using local and
national standards indicate that over 400,000 square feet of new commercial/residential
space could be supported within the riverfront area. Employment from such growth could be
substantial and, depending on the mix, could be well over 1,000 additional employees.
Back to Table of Contents
Recent Public and
Private Investments in the Waterfront Area
Since the late 1980s, more than $1.1 million of City and Community
Development Block Grant funds have been expended for infrastructure improvements and other
projects aimed at achieving the recommendations of these studies. The following projects
have been implemented to date. See Appendix A for further detail on these projects.
Reconstruction of Cochecho Street
School/Mechanic Street Rehabilitation and Associated Parking
Upgrade to Maglaras and Henry Law Parks
Dredging of portion of Cochecho River
Creation of Immigrants Park
Portland Avenue Parking Area
Miscellaneous infrastructure Improvements on Main, Washington Streets
Preliminary Marketing and Environmental Studies, City-Owned Land
In addition to the above, more than 34 million dollars in public funds has
been expended on the construction of a new secondary wastewater treatment plant. The
location of the new facility further downstream allows for the future demolition of the
Citys primary facility on River Street.
Significant investments have also come from the private sector. More than
$2 million dollars in improvements have been made to buildings within the study area,
particularly the Pacific Mills and One Washington Center. Pacific Mills has been
completely rehabilitated and today houses more than 1,000 employees of the Liberty Mutual
Insurance Company. One Washington Center, formerly Clarostat, has had almost two-thirds of
its 300,000 square feet of floor space reconstructed. This building, acting as an
incubator space for a variety of several small companies, has more than 200 employees,
with another 250 expected by Spring, 1996.
Recently, development of the riverfront has taken on an increased
priority. The City, in cooperation with the Greater Dover Chamber of Commerce, has
initiated the Cochecho Riverwalk Project. The proposal involves a $350,000 multi-phased
program aimed at enhancing pedestrian traffic and development on the riverfront area. See
Figure 2, p. 8
Phase I of the Riverwalk has been completed. More than $100,000 has been
expended on the creation of a 1,400 feet of new sidewalks
immediately adjacent to the river, a cantilevered lookout, picnic shelters,
Victorian lighting and park benches. Phase I is scheduled to begin in the
Spring of 1996 and will include the creation of a brick plaza next to the
parking area behind Butterfield Gym and the construction of a pedestrian
bridge across the river at the end of the Washington Street sidewalk.
Funding for Phase II comes primarily from the $130,000 private fundraising
drive conducted by the Greater Dover Chamber of Commerce. The city has pledged an
additional $250,000 for construction of the pedestrian bridge and the demolition of the
old wastewater treatment plant.
In summary, the revitalization of the riverfront is in full swing. The
private and public sectors have teamed up to create an environment
primed for capital investment. Additional infrastructure and physical
improvements still need to take place to insure the expansion of long-term opportunities.
Back to Table of Contents
III. Project Goals and
Purpose
Public input solicited prior to and during the Charrette process generated
several goals for redevelopment and reuse of the City-owned property.
Place 35 acres of prime waterfront property back on the tax rolls
Fully utilize city-owned land
Enhance ongoing revitalization of the downtown business area
Provide opportunity for greater public activity and
waterfront access
Make Dover a destination for cultural tourism by incorporating
the Citys historical character and heritage into waterfront revitalization
The Charrette team used these goals to create alternative visions for the
waterfront, thereby creating the "recipe" to be followed by the City in its
efforts to market the property and guide the redevelopment process.
Back to Table of Contents
IV. Selected Design Concepts
The Design Charrette
The Design Charrette provided an open forum for design professionals and
local citizens to brainstorm ideas and concepts for reuse of the City-owned property on
the Cochecho River. The Charrette Team consisted of professional and local experts with a
wide range of expertise in the fields of waterfront development, architecture, planning,
engineering, and economics. An important aspect of the Charrette Team was the inclusion of
professionals from outside the community to provide a fresh and unique perspective to the
redevelopment effort. A detailed list of the Charrette Team members and their background
is provided in
Appendix B.
The two-day intensive effort was managed by the team leader, Paul
Buckhurst of Buckhurst, Sigh and Jaquemart, Inc. After a tour of the waterfront area and
Cochecho River, guest team members worked individually or in groups to develop
sketches and concepts for re-use of the City-owned property. The local team
representatives worked closely with the guest team by providing input relative
to previous studies, site constraints, and other background information. Detailed
descriptions of the sketches and concepts developed during this initial session are
provided in Appendix C of this document.
Preliminary Design Effort
Themes and uses developed during the first Charrette design session were
used as a basis for preparation of two (2) selected design concepts.
Common themes included:
Wilderness Areas
Continuous Open Space Belts
Historical Preservation
Cultural Activity Center
Small Scale Development Sites
Tourism
Flexibility for Longer-Term Uses
These themes were carried out by the following sampling of
possible uses:
Indoor (winter) Recreation
River/Mill Museum
Restaurant
Professional Offices
Public Amphitheater
Destination Marina
Housing
Recreation/Open Space and Parking
To develop clearer, more detailed pictures of how these themes and land
uses could be implemented, the Charrette Team broke into two (2) groups with the directive
to integrate the themes and land uses into overall concepts of varying intensity.
Selected Design Concepts
The selected design concepts evolved from further efforts by the Charrette
Team. While both concepts employ many of the themes and uses noted above, one concept (Low
Intensity Concepts as seen in Figure 3, P. 11) proposes a lower density of
development than the other (Moderate Intensity Concept as seen in Figure 4, p. 13).
Concept 1 Low Intensity
Concept
Concept 2 Moderate
Intensity Concept
Back to Table of Contents
V. Design Guidelines
for Development
Although each of the selected design concepts was intended to demonstrate
different approaches to redevelopment and reuse of the City-owned property, they did bring
forward many common themes and ideas. Many of the themes and uses which evolved from the
Charrette discussions were interestingly consistent with those of previous studies,
confirming the communitys vision of the waterfront and its possibilities.
During the closing discussion, the Charrette Team recognized not only the
differences, but also the similarities in the two concepts. While the Team felt that the
concepts represented different philosophies to development, it was also recognized that
the concepts ere not necessarily mutually exclusive. Each concept offered components which
leant themselves to an orderly and economically sound approach to redeveloping the
underutilized City-owned land without compromising the existing downtown and without
losing sight of maintaining a spectrum of options through phasing of the effort.
Furthermore, it was recognized that although the conceptual plans
represent two possible approaches to waterfront redevelopment, they are not intended to be
absolute blueprints for the future.
Purpose for Design Guidelines
This section presents a set of recommended guidelines that are based upon
the themes and conceptual plans from the Charrette and are intended to ensure that the
future development of the Cochecho waterfront site reflects the goals of the community.
These guidelines are intended to meet the following purposes:
To encourage mixed-use development and at a scale compatible with
existing surrounding uses.
To provide appropriate vehicular and pedestrian circulation that
recognized the unique historic and waterfront environment of the site
To provide opportunities that encourage visitors and tourists to
experience the waterfront area as a recreational, cultural and historic environment.
To ensure orderly development of the waterfront that will enhance
ongoing downtown revitalization and will augment the economic well-being of the City of
Dover.
To conserve the natural environment through a strategy of
protection, conservation and appropriate land management.
Design Guidelines for Development
The development guidelines were organized into the four (4) following
categories: scale and land use; environmental quality; circulation and access; and
management of development.
Scale and Use
New development should allow for the following types of uses or
activities: year-round recreation, museum/cultural center, restaurant, professional
offices, public amphitheater, destination marina or similar water-dependent use, housing,
automobile parking, open space and scenic vistas.
Ground floors of building should be considered for such active uses as
restaurants, stores and indoor recreation, especially when adjacent to public spaces.
Density pattern of new development should complement current adjacent
development and the unique historic waterfront environment.
Incorporate building types, architectural forms, materials and colors
that are compatible with existing downtown built forms
To the extent possible, incorporate the existing historic structure
(former County jail) within the new development.
Ensure that new development is compatible with adjacent recreation area
and green space and provides opportunist for waterfront recreational activities such as
public marina, small-boat launch ramp and outdoor public gathering place for cultural
activities
Locate new structures, landscape features or other uses so as to avoid
obstructing view from nearby public roads or spaces and upland area.
The aggregate impervious cover, including buildings, parking areas and
roadways shall not exceed 30% of the site.
Any water-dependent use proposed for the immediate shoreline
shall not exceed 15 in height.
No building within 300 of the shoreline shall exceed 25 in
height.
Beyond 300, building heights shall not exceed 35 and shall minimize the impact
to the visual environment.
All site lighting shall be consistent with the style and height as
installed along the existing Riverwalk in Henry Law Park.
All new development shall be integrated into the existing landscape so
as to minimize its visual impact and maintain the natural beauty and environmentally
sensitive shoreline areas through use of vegetative and structural screening, landscaping
and grading.
Fences utilized within the site and along walkways shall be harmonious
with those heights and styles found along the Riverwalk.
Length of contiguous structures shall be planned so as to establish and
protect view corridors to the waterfront and to preserve access routes from upland areas
to the waterfront. Coverage and building height requirements may be modified in specific
instances so long as the overall development is consistent with goals and other design
guidelines.
Environmental Quality
Recognize the transition from a "wilderness-like" river
environment to an urban waterfront.
New landscaping should include strategic placement of shrubs and trees
to ensure that new development maintains and enhances the visual quality of the shoreline
and overall waterfront site.
Employ environmentally sound land management practices during land
development and long-term maintenance of the waterfront parcel.
Circulation and Access
Incorporate a waterfront walkway within a 50-foot vegetative buffer for
the full length of the shoreline. Where other uses may encroach upon this walkway, ensure
provision of continuous pedestrian circulation along the waterfront.
Work with Dover Heritage Walk Group to prove interpretive signage at
appropriate locations along the riverwalk or in public spaces.
Ensure that signage motif is compatible with that established in the
Henry Law/Cochecho Riverwalk project.
Link waterfront environment with upland area by establishing pedestrian
routes and maintaining the natural corridor at the eastern portion of the site.
Off-street parking shall: (1) be based upon existing and/or historic
ratios as provided in such publications as: Offstreet Parking Requirements, American
Planning Association, Planning Advisory Service Report #432 and The Dimensions of Parking,
3rd Edition, Urban Land Institute and the National Parking Association; (2) may
be provided off-site within a reasonable walking distance; and (3) incorporate appropriate
landscape features to break up the expanse of pavement. (See Framingham, MA, Route 9
Design Guidelines section of Site Plan Review Regulations).
Internal roadways shall be designed in a curvilinear fashion in order to
take advantage of existing topography and encourage low vehicle speeds.
Internal roadways shall not exceed 28 in width and shall maintain
a parkway appearance. No parking shall be allowed on the primary circulation roadway.
Walkways shall be of brick and/or granite in keeping with the
surrounding downtown.
All pedestrian walkways shall be separated from roadways by
landscaped areas, where possible, or granite curbing, at a minimum.
Management of Development
For purposes of reviewing any new development on the waterfront
sites, a Waterfront Development Review Committee shall be
established by the City Council. Such Committee shall be comprised of five (5) members,
one of whom shall be a registered professional architect, and one of whom shall be a
professional landscape architect. Such committee shall review proposed development to
ensure that it is consistent with these guidelines and shall make a recommendation to the
City Planning Board for approval, approval with conditions, or denial.
Any proposed development shall conform to existing City of Dover site
plan regulations for:
Drainage and stormwater management
Grading and erosion control
Noise, vibration, odors and similar concerns, and
Natural resource protection
Back to Table of Contents
Appendix A -
Previous Studies and Recent Construction Projects
Previous Studies
The Pacific Mills Master Plan, 1984, made the following
recommendations:
Encourage and promote private and public development of the Cochecho
Riverfront including the creation of a new riverfront park, marina and public boat access.
Market a portion of the City-owned land for residential and mixed-use
development.
Relocation of the sewage treatment plant and department of public works
facilities.
Construct a new Washington Street bridge over the Cochecho River.
The City of Dover Master Plan, 1988, recommended the following:
Restoration of the Cochecho Waterfront to optimize open space,
recreation and water access, with a private development scheme.
Relocation of the wastewater treatment plant and department of public
works facilities.
Development of a comprehensive strategy for the public lands
adjacent to the Cochecho River
Conversion of the Clarostat building.
The Land Acquisition and Protections Study, 1989, made the
following recommendations:
Public access to the Cochecho River should be a high priority,
particularly in downtown Dover or the immediate area. The City-owned parcels were
recommended for this use.
An existing pipe bridge which crosses over the Cochecho River
between the City-owned land and the end of Washington Street
should be upgraded to allow for pedestrian and possibly vehicular traffic.
The city may need to dredge portions of the Cochecho River in order to
provide increased boat traffic.
The Cochecho River Harbor Management Plan, completed in June of
1990, made 37 recommendation regarding harbor management in the study area, including the
following:
Provide additional boating access through increased dockage,
public mooring opportunities, and boat launching facilities.
Develop a Master/Site Plan for the public land currently occupied
by the Sewage Treatment Plant and Public Works Facility. Use the Master/Site Plan to
prepare a developers kit and solicit proposals for development of the property.
Encourage the private development of a mix of office, retail and
residential uses of the City-owned land.
Develop a riverfront park on the City-owned land.
Reconstruct a new Washington Street bridge over the Cochecho River.
Establish a waterfront greenbelt to connect downtowns
population center with riverfront recreational opportunities and facilities such as Henry
Law and Maglaras Parks.
Continue to investigate and eliminate direct and indirect sewage flows
and storm water runoff to the Cochecho River.
Finally, the Cochecho Waterfront Master Plan, completed in July of
1991, made several recommendations regarding the City-owned land on River Street.
Relocate the Public Works Facility.
Provide boat access and marina facilities.
Expand recreational fields.
Design new access to the parcel.
Back to Table of Contents
Recent
History of Construction Efforts
The City has embarked on an aggressive campaign to redevelop and
revitalize its Central Business District and adjacent waterfront areas. Private developers
and local businesses have joined with the City in a public/private partnership. The goal
of this partnership is to fully utilize the Cochecho Rivers significant waterfront
development and recreational potentials by developing an integrated, coordinated strategy
which takes into account future water and land issues and protects the environment at the
same time.
Below is a more detailed description of some of the investments that
have already taken place in the waterfront area:
Reconstruction of Cochecho Street - $375,000
The project involved replacement of water lines,
drainage lines, realignment and widening of the street, new curbing and construction of a
retaining wall.
School and Mechanic Streets - $209,000
The project included re-configuring of School Street, linking School
Street with Mechanic Street, installation of drainage lines and sidewalks, and the
creation of a sixty-six car parking lot.
Upgrade to Maglaras and Henry Law Parks - $175,000
Project involved road upgrades, recreational equipment, playing fields and
handicapped accessibility measures.
Dredging of portion of Cochecho River - $200,000
A 750-foot section of the Cochecho River adjacent to George Marina
an the Citys riverfront parcels was dredged in 1984
Creation of Immigrants Park - $40,000
A large, condemned structure was torn down in order to create an open
green space enhancing several more historic buildings.
Portland Avenue Parking Area - $20,000
A forty-five (45) car parking area was created at the intersection of
Portland Avenue and Portland Street.
Miscellaneous Infrastructure Improvements - $30,000
Miscellaneous infrastructure improvements, including sidewalks, curbing
and lighting, on Main, Washington, and Portland Streets.
Preliminary Studies, City-owned Land - $25,000
Preliminary environmental and marketing studies have been conducted on the
City-owned parcel on River Street.
Back to Table of Contents
Appendix B - Charrette Team
Cochecho Waterfront Charrette Team
The Charrette Team was comprised of guest team members from
throughout the New England region and local team members from Dover.
The following is a list of Charrette Team members and a brief summary
of their background and/or areas of expertise:
Guest Team:
Paul Buckhurst, Leader Founding principal of Buckhurst, Fish
& Jaquemart, Mr. Buckhurst has worked on a variety of urban development/design
studies, including open space, waterfront and tourism-related studies throughout the USA.
Mr. Buckhurst has been a member of the Design Committee of the New York Parks Council
since 1991. He is currently Chairman of the American Planning Association Waterfront
Committee for New York City.
Bissera Antikarov, Architect & Planner Currently
employed by the
City of Cambridge, Massachusetts Community Development, Ms. Antikarov holds a Masters in
Architecture from the University of Architecture and Civil Engineering, Sofia, Bulgaria,
and a Masters of Science in City and Regional Planning from the Pratt Institute.
Michael Lassel, Architect Mr. Lassel is the principal and
founder of
Lassel Architects, Berwick, Maine. In addition to providing architectural
services to private and public concerns throughout New Hampshire and
Maine, Mr. Lassel has acted as a facilitator for the New Hampshire Office
of Statewide Planning Community Stewardship Program.
John Copley, Architect/Landscape Architect Mr. Copley is
founder
and owner of John Copley and Associates, Boston, Massachusetts and
has extensive professional experience in site planning, design, and
implementation for projects throughout New England, including waterfronts and parks.
Douglas Greiner, Landscape Architect Mr. Greiner is a
principal of
Sherman Greiner Hallé Ltd., Concord, New Hampshire. His experience
spans 21 years in land planning, design and landscaping architecture and includes a number
of awards and civic/professional affiliations.
Laurence R. Goss, Jr, Ph.D. Dr. Goss is principal and owner
of Northern Economics Planners where he is responsible for projects involving economic and
community planning ad development strategies, development feasibility studies, resource
economics, and tourism research.
Kenneth R. Rhodes, P.E., Civil Engineer Mr. Rhodes is an
associate
and project manager with Costello, Lomasney & deNapoli, Inc., Manchester, New
Hampshire. Mr. Rhodes responsibilities include management of land development
projects throughout New Hampshire.
Local Team
Steve Stancel - City of Dover Planning Director
Dean Peschel City of Dover Conservation Officer
Michael Bobinsky City of Dover Community Services Director
Beth Thompson Dover Economic Development Corporation
George Maglaras Georges Marina
Jack Story Executive Director, Greater Chamber of Commerce
Renny Perry Former Mayor, City of Dover/Downtown merchant
Ron Cole Dover Planning Board Chairman
Roberta Woodburn Landscape Architect, Woodburn & Associates
Landscape Designer
Thomas Minter Gardens With Style
Jack Mettee Planner, Appledore Engineering, Inc.
Dana Lynch - Civil Engineer, Civilworks, Inc.
Back to Table of Contents
Appendix C -
Alternative Design Concepts
The Charrette format provided for an informational tour of the Downtown
and Riverfront areas during the afternoon of Friday, July 14th. This tour
included an overview of ongoing City projects and plans presented by Steve Stancel, City
Planning Director, and an update on the combined efforts of the City and Chamber of
Commerce relative to planning, construction and funding of the Henry Law Park upgrade, the
Cochecho Riverwalk, redevelopment of City property, and Cochecho River dredging.
The Charrette team was then escorted along the "downtown"
side of the riverfront area by Cathy Beaudoin, Local historian, and guided through
an historical perspective of the significance of the riverfront
in Dovers economic growth and development. This portion of the tour
terminated at Georges Marina, where the Charrette team was given a
tour of the river by George Maglaras from the marina to the confluence
of the Cochecho, Salmon Falls and Piscataqua Rivers. The Charrette team disembarked at the
City Public Works/Bus Storage side of the river and was escorted through the City property
by Michael Bobinsky,
Community Services Director. The tour concluded at the City Hall
Auditorium, where the team set to work immediately.
Paul Buckhurst asked that the entire guest team begin with a
"brainstorming" session by working individually or with other team members to
develop a sketch of ideas and concepts for reuse of the City-owned property. All
possibilities were open for discussion and presentation. The following section focuses of
the ideas and discussions, which evolved from this effort.
Concept A John Copley and Mike Lassel
The emphasis of this collaborative effort focused of the importance
of the existing downtown area. The authors of this concept felt that the downtown area
needs to be strong and that real development needs to occur in this area prior to new
development on the City land in order for the reuse or redevelopment to work.
This concept also pointed out the disparity between the wilderness
character of the majority of the length of the river and the stark and
somewhat deteriorated appearance at the terminus in the area of the
City property. Accordingly, the authors felt that reuse should include
open space development and opportunities to maintain wilderness up
to the potential boat landing area opposite Georges Marina. Natural area would
provide diversions between various uses (i.e., between recreation and commercial areas).
These uses included, commercial, residential, historical and marina uses.
Throughout this concept, the focus was the quality of life of the
community and its relationship to the river. Towards this end, the following components
were predominant:
Gardens/park area on riverfront
Reuse of the old jail as a cultural center surrounded by meadows
and large areas of vegetation
Make visual connections with the existing downtown (i.e., views
of City Hall, Garrison Hill, and St. Johns)
Develop a strongly historical and "wharfy area" (buildings
should
look historical)
Work with historical and cultural aspects in developing landscape
treatments
Transportation was also a focus in this concepts, particularly the
development of a multi-model theme which incorporated a Chestnut
Street train station, adequate vehicular patterns and parking facilities,
and enhancement of river transportation possibilities. Links were
emphasized which reinforced pedestrian use and the existing downtown
center. Within the redeveloped City land, parkways would provide limited, low speed, low
volume vehicular links between waterfront and recreational uses.
Concept B Bissara Antikarov
This schematic proposal focuses on blocks of reuse/redevelopment within
the City land with an emphasis on internal vehicular and pedestrian links.
The main access and "gateway" to the property would be a bridge,
which served pedestrians and vehicles. The perimeter of the project
would feature a pedestrian walkway with numerous corridors or access
points to the river. A commercial area with marina, restaurant, and public
plaza is a major component of this concept, as is a strip of two-story
office buildings with offices on second floor and retail/office space on
the first floor.
Other components of this concept include development of the former
jail site as an historical museum, residential development in the elevated
plateau areas surrounding the property, and vehicular routes in the form
of parkways.
Concept C - Doug Greiner
The focus of this concept was maximum use of the river to entice
tourism. Towards this end, it was suggested that the navigable waterway be terminated as
close to the existing Pipe Bridge as possible. The proposed "extension" of the
river would include construction of a cove or turning basin called "Dover Wharf"
(the proponent recognized the associated permitting issues). The additional water frontage
resulting from this construction would be utilized to provide for additional opportunities
for mixed-use development along the river. This riverfront development would include a
restaurant.
Concept D Ken Rhodes
This concept included many similar themes to those mentioned above,
as well as some innovative suggestions. In addition to emphasizing a
vehicular bridge connection to create a "main spine" through to Maglaras
Park and Henry Law Avenue, this plan addresses maintenance of a
greenbelt and creation of specific building "Pad" areas. One primary feature,
addressed in other concepts, is a public boat launch/ferry landing facility with an
"upscale" restaurant and deck overlooking the river.
In recognition of current discussions regarding downtown parking
availability and the need to properly address a flexible built-out scenario for the City
land, this concept encourages a multi-story parking garage. This facility would be
positioned to provide access from the Washington Street extension and River Street at the
lower level, while also providing access from the grade of the plateau above the current
recycling/brush pile area. This upper level would provide an interesting vantagepoint for
corporate offices. A façade similar to the existing mill buildings would provide a tie to
the existing downtown.
Innovative components of this concept tie well into the adjacent
recreational uses, while stimulating activity in the riverfront area over a year round
time frame. Two of these components include:
Concept E - Larry Goss
The focus of this concept was the development of a simple proposal,
which would incur minimal costs to initiate. A vehicular bridge was not
included because of cost, and river dredging beyond required maintenance dredging is also
not felt to be cost-effective.
An important component of this proposal was the enhancement of the
opposite side of the river to create a more attractive vista. Toward this
goal, the following suggestions were pertinent:
City needs to redevelop the parking area across from One Washington
Center and remove the pocket of blight by improving parking availability.
Efforts should be made to obtain a pedestrian trail easement along
the "downtown" side of the river to parallels the proposed riverwalk extension.
Higher and better uses need to be sought for vacant or underutilized
proper ties associated with the existing marina (this includes the old gas works building)
On the City-owned property, some uses similar to other concepts were
proposed:
Pedestrian trails along the riverbank including exercise stations
Move parkway-style road away from the river
If acquired, reuse old prison site as a heritage center
Only two (2) buildings were proposed between the road and the river.
These would include a bathhouse with a restaurant, 100 seats or less,
similar to Burlington, Vermont, and an inn geared toward business and
conferences with 30-50 rooms. Some offices and retail could be
accommodated of the opposite side of the road (away from the river).
One possibility to be investigated would be the locating of the District
Courthouse on the hillside surrounded by offices to support the Court.
Townhouse-style residences could be built into the hillside behind the
current recycling facility site.
Summary Paul Buckhurst
As team leader, Paul Buckhurst made note of several common ideas in the
concept plans:
Balance preservation with Investment dollars
Address the historical aspects of the river and shipping as they relate
to tourism
Determine what is marketable in the long term, and make long term
decisions
Maintain open space as a dominant feature along the river edge
Provide for a 100-foot setback for buildings which allows for
curvilinear walkways and one (1) restaurant linked to decking
facilities
Reuse of the prison building as a museum for historical and cultural
uses
Pursue some form of dredging to allow for increased boat traffic
Set aside three (3) "pads" for future development
Extend River Street through the site in a "parkway"
Provide outdoor community gathering area/amphitheater
To summarize this initial "brainstorming"session, a list of
themes and uses was prepared for reference in preparing selected design concepts. As the
Charrette Team progressed through preparation of the selected design, each group attempted
to incorporate these themes and uses within the context of low, medium, and high intensity
concepts.